Bridgewater Barges Installed
McConnell Dowell Constructors have installed the 12 IMC-designed barges end-to-end across the River Derwent at Bridgewater, in Hobart. The barges are to be used in the construction of a new bridge across the river. Mobile cranes of up to 600 tonnes capacity will be used to drive bridge piles from the barges.